East Area Gas Utilization Project (EAGU)
Client: Chevron Nigeria Limited/DeltaAfrik
Scope: Conceptual & FEED
Date: Jan 2007 – Sept 2007
Man Hours: 3,556
Field Location: RBK, Idama & Inda Fields
PROJECT DESCRIPTION
The main objective of the project is to install gas utilization facilities that will eliminate routine gas flaring in the Eastern fields of Chevron Nigeria Limited. The project comprised the:
•Gathering & transporting of multiphase fluid from Idama and Jokka fields to Ekulama-2 for processing.
•Gathering of AG at RBK PP and transporting to Santa Barbara Facility. Produced oil & water at RBK PP will be evacuated to Nembe Creek Trunkline.
•Gathering of AG at Inda MOPU and transporting to Bonny F/S.
SEAMETRIC SCOPE
Seametric’s scope of work on the project, as a Subcontractor to DeltaAfrik, include conducting Technical/Quality Assessment of the process engineering deliverables on the project and provision of personnel support to the project. |