Client: Chevron Nigeria Limited/DeltaAfrik
Scope: Front End Engineering Design
Date: Oct 2007 – Dec 2007
Field Location: Opuekeba, Utonana & Makaraba
Man Hours: 10, 282
PROJECT DESCRIPTION
Chevron Nigeria Limited intends to gather all produced gas currently being flared at its onshore facilities to eliminate continuous gas flaring in the field. The work consists of installation of Multiphase Pumps (MPP), modification of production and test headers to channel all LP multiphase fluid to the suction of the Multiphase Pumps, and all required utilities modifications. The additional facilities will be installed on the existing deck structure located over shallow water in the Delta State.
SEAMETRIC SCOPE
Seametric in partnership with DeltaAfrik participated in the successful execution of the Front End Engineering phase of the project through provision of design/office facilities, ICT and personnel support to the project. The project team was based in Seametric’s Ikoyi office.

|